top of page
57BEA5E5-8E7F-4381-AC73-F84F30C737EB.jpeg

01

Toluene Dehydration Panel

Allen-Bradley PLC based dehydration skid.  Integrated pneumatic valve switching manifold with all tubing internal to the panel.  Overtemperature protection and Z-Purge NEMA 4X panel for Class 1, Div 2, Groups BCD hazardous area.

02

Flame Front Generator Skid

Flame Front Generator (FFG) skid with integrated NEMA 7 panel (Cast Iron), instrumentation selection and installation, as well as all piping and skid structures.

47DF931A-31FF-4468-9628-EEE7471E6F40.jpeg
7CE2C976-7976-42CA-8F62-6153FB2A56B5.jpeg

03

Redundant Plant PLC System

Fully Redundant Allen Bradley PLC system with panel mounted color touchscreen Human Machine Interface (HMI). System has redundant controllers, power supplies, Input / Output (I/O) cards and backup Uninterruptable Power Supplies (UPS), nicely packed in a Stainless Steel NEMA 4X panel.

04

Fuel Management Skid

PLC based fuel-management skid with double block and bleed (DBB) valve configurations.  All electrical and instrumentation installed and tested, complete with a Z-Purge system for use in a Class 1, Division 2, Groups BCD hazardous environment

9F61449F-7BE9-4B37-BD70-33F6DA588F6F.jpeg

Controls & Automation Engineering

sales@cae-tulsa.com

(918)-688-4768

©2023 by Controls & Automation Engineering. Proudly created with Wix.com

bottom of page